Pioneer Point

London and Regent Construction – Pioneer Point
Pioneer Point is an iconic landmark in the Illford Neighbourhood of London. It comprises of two towers. The north tower is 105m tall with 33 floors and the south tower is 82m tall with 25 floors. It is a mixed use scheme completed in October 2012, amounting to approximately one third of a million square foot development.

The scheme achieved active backing of the Mayor of London’s Office, the GLA Urban Design Office, Transport for London and the Deputy Prime Ministers Office, which later caused the East London Transit Link proposals to be brought forward.

UBS supplied the north tower with a single passenger materials hoist, and the south tower with another single passenger materials hoist.

  • Pioneer Point Ilford Single Passenger Materials Hoist 2037 Side View UBS Hoists and Access

  • Pioneer Point Ilford Single Passenger Materials Hoist 2037 UBS Hoists and Access

Canary Wharf BP2
BP2 Canary Wharf UBS Common Tower System Twin High Speed Passenger Construction Hoist
Broadgate Tower
Broadgate Tower twin passenger hoists common tower by UBS.
Stratford Tower
150 Stratford High St Wide Tower 2 Cages UBS Hoists 2
The Landmark
CPL The Landmark Tower Featuring UBS Twin Construction hoists for Passengers
Stratford Residential Blocks
Athletes village blocks N03 N04 single hoists steel bridges 2 UBS construction hoists
Ontario Tower
Common Tower System and High Speed Construction Hoist from UBS, view of top, Ballymore Properties, Ontario Tower, London Close Distance View
Dandara KD Tower
Image Project Hemel Showing UBS Twin Mid Speed Construction Hoists And Common Tower System Distant View
Seager Tower
Seager Tower UBS Common Tower & Twin Standard Speed Passenger Hoist
Heron Tower
Heron Tower Distance shot UBS Common Tower & 2 Twin High Speed Passenger Construction Hoists
Dickens Yard
UBS Common Tower Access Syatem at Dickens Yard London
Swiss Re Tower
Swiss Re The Gherkin Construction Mammoth & Twin High Speed Passenger Hoists on a UBS Common Tower
Chelsea Creek
Chelsea Creek Residential Construction Project Distant View
St Bartholomew’s Hospital Phase 2
St Barts Project Phase 2 Construction Hoist Works Side View
Canary Wharf
Canary Wharf DS3 Citigroup DS5 HSBC UBS Construction Hoists
Kings Cross Central P1
UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 02
St Botolphs Tower
St Botolphs Showing Both UBS Common Tower and Twin ans Single Standard Speed Construction Hoist Installations
Elektron Project
UBS Common Tower and Twin Standard Speed Passenger Hoists at Elektron Towers
Dollar Bay
Dolar Bay Tower
Canary Wharf DS3
Canary Wharf DS3 East & West Project UBS Common Tower System Base
Pan Peninsula Towers
Pan Peninsular Tower Featuring UBS Common Tower System and Twin Construction Hoists Site Wide View #2
Lee Tunnel
Lee Tunnel Construction Using UBS Tri Mast Hoist Aerial View
Highpoint Newington Butts
Beetham Tower
Beetham Tower UBS Common Tower Twin High Speed Passenger Hoist
One The Elephant
One The Elephant Residential Development London
London City Island